S Curve Brass Bedside Table - Dark Brown
Available in stock (1)
-
Estimated delivery for orders placed today before 5 PM CST : Aug 23 - Aug 27
Couldn't load pickup availability
Calculate Shipping Cost
Enter your zip code to see shipping options for this product.
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information. Learn more.
FAQ
FAQ
Visit our FAQ page to find answers to common questions about orders, purchases, refunds, exchanges, shipping, and tracking.
Shipping
Shipping
At Meri Furniture, we are committed to providing clear and transparent shipping information. Please review the details below before placing your order.
Order Processing
All orders are processed within 1–3 business days after payment confirmation, Monday through Friday.
Orders placed on weekends or holidays will be processed on the next business day.
The estimated delivery time depends on when the order was placed in relation to our Order Cut-Off Time: 5:00 PM CST.
Once your order has shipped, you will receive a confirmation email with your tracking number. You can monitor your shipment anytime on our Track Your Order page.
Shipping Coverage
Meri Furniture currently ships to all contiguous United States (the 49 mainland states).
We do not ship to:
- Alaska
- Hawaii
- U.S. Territories
- International destinations (including Canada)
Orders placed with delivery addresses outside our coverage will be canceled and refunded.
Shipping Methods and Delivery Times
Estimated Transit Times: 5–8 business days
Estimated delivery time based on customer locations: 6-11 business days
All available shipping methods, costs, and estimated delivery times are shown at checkout before you complete your purchase.
Delivery times are estimates and may vary due to carrier delays, weather, or other unforeseen circumstances.
Shipping Rates
Shipping rates are calculated on the product page and at checkout based on the item’s weight, dimensions, price, and delivery address.
Oversized or heavy furniture may incur additional surcharges, which will be displayed before checkout.
Multi-Brand Orders & Shipping Calculation
Meri Furniture carries products from a variety of brands and suppliers. Some brands — offer complimentary shipping directly as part of their product offering.
When your order includes products from multiple brands, please note the following:
- Products from specific brands** ship free, regardless of order total.
- If your order also includes products from other brands, shipping for those items is calculated separately based on their combined subtotal and the rate table above.
- The free shipping threshold ($3,000.00 and above) applies to the subtotal of eligible products only, excluding any items that already qualify for brand-sponsored free shipping.
Shipping costs for each applicable portion of your order will be clearly displayed at checkout before you complete your purchase.
**Specific Brands
"8th Street,Acme,Artistry At Home,Ashcroft Furniture,Bernards Furniture,Daily Nest,Dreamcloud,DreamHaus,Dreamland,Emerald Home,Furniture Max,Global Furniture USA,Glory Furniture,Golden Mattress,Halcyon Home,Hearth and Haven,Home Essentials,House & Home Furniture,Icona Home Decor,Jennifer Taylor Home,JLA,JUSTONE INTERIOR,Klair Living,Life Outside,LSI Patio Furniture,Lumi Source,Luxe & Co.,MD Mattress,Naar Rug,Noble House,Patioseek,Refined Comfort,Restonic Mattress,Ridgecrest Home,Simpli-Home,Somnus Mattress USA,Suite Bebe,The Soft House,Timeless Haven,Urban Retreats,US Pride"
Free Shipping
Select products or orders that meet the minimum purchase threshold may qualify for free shipping. Applicable promotions or free-shipping offers will be clearly displayed during checkout.
Local Pickup
Local pickup is available from our Elk Grove Village, IL location only: 2244 Landmeier Rd, Elk Grove Village, IL 60007
Select Local Pickup at checkout. You will receive an email with pickup instructions once your order is ready. Feel free to review our local pickup page to learn more.
Order Tracking
Once your order ships, you will receive an email with a tracking link. Please allow 24–48 hours for the tracking information to update after the carrier picks up the package.
Delayed Shipments
Shipping delays may occur due to carrier routing, weather conditions, peak seasons, or other unforeseen circumstances. Customers may track their shipment using the tracking number provided after fulfillment.
Meri Furniture is not responsible for delays caused by third-party carriers.
Address Changes
Please ensure your shipping information is entered accurately at checkout.
Once an order has been fulfilled and shipped, we are unable to modify the delivery address.
Orders returned due to incorrect or incomplete addresses may incur additional reshipping fees.
Damaged or Lost Deliveries
If your order arrives damaged, please inspect the packaging and product immediately upon delivery.
You must report any damage within 48 hours by emailing:
Please include:
- Photos of the damaged item
- Photos of the packaging
- Your order number
If your order is lost in transit, please contact us so we can initiate a carrier claim and arrange a resolution.
Order Changes or Cancellations | Shipped Products
We cannot guarantee modifications or cancellations once an order has been processed or shipped.
Contact Us
Address: 2244 Landmeier Rd, Elk Grove Village, IL 60007, United States
Email: info@merifurniture.com
Phone: +1 (260) 786-5353
Return & Refund
Return & Refund
We have a 30-days return policy, which means you have 30 days after receiving your item to request a return.
To be eligible for a return, your item must be in the same condition that you received it, unused, with tags, and in its original packaging. You’ll also need the receipt or proof of purchase.
To start a return, you can contact us at info@merifurniture.com. Please note that returns will need to be sent to the following address: 2244 Landmeier Rd, Elk Grove Village, IL 60007.
Customers are responsible for providing their own return shipping label and covering return shipping costs.
All approved returns are subject to a 10% restocking fee to cover handling and processing costs.
We do not accept exchanges.
You can always contact us for any return question at info@merifurniture.com.
Damages and issues
Please inspect your order upon reception and contact us immediately if the item is defective, damaged or if you receive the wrong item, so that we can evaluate the issue and make it right.
Exceptions / non-returnable items
Certain types of items cannot be returned, like custom products (such as special orders or personalized items). We also do not accept returns for hazardous materials, flammable liquids, or gases. Certain items such as clearance, or final-sale items may be non-returnable.
Please get in touch if you have questions or concerns about your specific item.
Refunds
We will notify you once we’ve received and inspected your return, and let you know if the refund was approved or not. If approved, you’ll be automatically refunded on your original payment method within 7-14 business days. Please remember it can take some time for your bank or credit card company to process and post the refund too.
If more than 15 business days have passed since we’ve approved your return, please contact us at info@merifurniture.com.
- Artisan Furniture Solid Wood S-curve Brass Bedside - This uniquely designed end table has been constructed from 100% solid mango wood in a chestnut finish. The divided design allows you to place or display items on the top middle or bottom shelf. It has 2 brass bars dividing the piece and giving it extra character. It can be used in the living room or hallway and paired with different styles of furniture in the home.
- Product Dimensions- Height: 23.62 in Length: 13.78 in Width: 17.72 in Weight: 22.05 lbs
- Features: 100% solid mango wood, chestnut finish, divided design with top, middle, and bottom shelves, 2 brass bars for added character, versatile for living room or hallway
S Curve Brass Bedside Table - Dark Brown
17.72in L, 13.78in W, 23.62in H, and 22.05 lb
Customer Favorites
Discover the pieces our customers keep coming back to. From everyday essentials to standout designs, these favorites are chosen for their comfort, style, and lasting quality.